Awarded Projects |
|
| Richard T Farmer School of Business |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Monarch Construction |
$36,422,000.00 |
| HVAC Contract |
Blau Mechanical |
$5,382,000.00 |
| FIRE PROOFING Contract |
Dalmatian Fire |
$503,000.00 |
| PLUMBING Contract |
Driekast Piping Corp. |
$1,323,060.00 |
| ELECTRICAL Contract |
Rapier Electric |
$6,128,022.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| CPA AH 1 and AH 3 Air Handlers Modifications |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Feldkamp Enterprises, Inc. |
$149,850.00 |
| ELECTRICAL Contract |
Butler County Electric |
$6,875.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Upham Hall SE Wing HVAC Upgrade |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Peck Hannaford & Briggs |
$424,000.00 |
| ALT. M-2 |
Peck Hannaford & Briggs |
$10,400.00 |
| ALT. M-3 |
Peck Hannaford & Briggs |
$7,400.00 |
| ELECTRICAL Contract |
Butler County Electric |
$24,999.00 |
| ALT. E-1 |
Butler County Electric |
$1,250.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Tappan Hall HVAC Improvements |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Progressive Plumbing |
$589,200.00 |
| ALT. M-2 |
Progressive Plumbing |
$17,000.00 |
| ALT. M-3 |
Progressive Plumbing |
$42,000.00 |
| ELECTRICAL Contract |
Essex Electrical |
$32,000.00 |
| ALT. E-2 |
Essex Electrical |
$500.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Scott Dining Hall ReRoof |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Field & Associates |
$184,601.00 |
| ALT. G-2 |
Field & Associates |
$5,000.00 |
| ALT. G-3 |
Field & Associates |
$5,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Hughes Hall Room 100 Auditorium Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Zeiser Construction |
$239,400.00 |
| ALT. G-2 |
Zeiser Construction |
$7,700.00 |
| ELECTRICAL Contract |
Butler County Electric |
$82,450.00 |
| ALT. E-2 |
Butler County Electric |
$0.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Boyd Hall Chiller Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Progressive Plumbing |
$84,600.00 |
| ALT. M-2 |
Progressive Plumbing |
$8,900.00 |
| ALT. M-3 |
Progressive Plumbing |
$2,800.00 |
| ELECTRICAL Contract |
Rapier Electric |
$27,000.00 |
| ALT. E-2 |
Rapier Electric |
$2,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Residence Hall Elevator Upgrades 2008 |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Advanced Elevator Company |
$66,357.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Hughes Hall Auditorium Reno Audio Visual Improvements |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Frontier Media Solutions |
$41,575.00 |
| ALT. O-2 |
Frontier Media Solutions |
$13,328.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Miami Inn Elevator Upgrade 2008 |
| Contract Type |
Company Awarded |
Price |
| ALT. G-1 |
Thyssen Krupp Elevator |
$65,530.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Art Museum Chiller Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Peck Hannaford & Briggs |
$97,400.00 |
| ALT. M-2 |
Peck Hannaford & Briggs |
$10,100.00 |
| ALT. M-3 |
Peck Hannaford & Briggs |
$3,670.00 |
| ELECTRICAL Contract |
Rapier Electric |
$6,848.00 |
| ALT. E-2 |
Rapier Electric |
$2,600.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Steam Plant Boiler Pollution Control Upgrades MACT |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Orbit Sheet Metal |
$5,118,000.00 |
| ELECTRICAL Contract |
DeBra Kuempel |
$1,260,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Walks and Drives 2008 |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Westside Paving and Excavating, Inc. |
$26,470.00 |
| OTHER Contract |
Prus Construction |
$222,600.00 |
| ALT. O-2 |
Westside Paving and Excavating |
$26,230.00 |
| ALT. O-4 |
Westside Paving and Excavating |
$36,290.00 |
| ALT. O-5 |
Westside Paving and Excavating |
$5,910.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Martin Dining Hall Elevator Replacement |
| Contract Type |
Company Awarded |
Price |
| ALT. G-1 |
Advanced Elevator Company |
$101,900.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Summer Painting 2008 |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Brian Brothers Painting |
$417,654.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Elevator Upgrades 2008 State |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Thyssen Krupp Elevator |
$54,900.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Millett Hall Entrance Concourse Renovations |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Valor Construction |
$490,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Harris Dining Hall East Dining Room Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
I.F. Weber Company |
$256,791.19 |
| HVAC Contract |
Peck Hannaford and Briggs |
$189,160.00 |
| PLUMBING Contract |
Driekast Piping Corp |
$22,500.00 |
| ELECTRICAL Contract |
York Electric |
$100,869.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Scott Hall Resident Room Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
TriState Renovations |
$369,252.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Miami Inn Roof Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Imbus Roofing Company |
$83,759.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Harris Dining Hall Kitchen and Serving Line Ceiling Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
MXP General Contractor |
$126,750.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Kumler Chapel Roof Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Imbus Roofing Company |
$424,400.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Presser Hall Rehabilitation Audio Visual |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Industrial Communication and Sound |
$152,604.60 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Hamilton Hall Area Coordinator Apartment |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Butler County Electric |
$77,822.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Student Athletic Development Center Exterior Concrete Stairs |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Oberer Thompson Company |
$140,280.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Warfield Hall Rehabilitation Audio Visual |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Frontier Media Solutions |
$57,726.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Airport Improvements - Partial Parallel Taxiway Lighting |
| Contract Type |
Company Awarded |
Price |
| ELECTRICAL Contract |
Bansal Construction |
$41,939.26 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Steam Plant Boiler Feedwater Pump System Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
DeBra Kuempel Company |
$138,500.00 |
| ELECTRICAL Contract |
Lake Erie Electric |
$13,120.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Pearson Plaza Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
R.A. Miller |
$322,000.00 |
| ELECTRICAL Contract |
Rapier Electric |
$23,572.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Heritage Commons Interior Painting |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Tri Star |
$106,580.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Psychology Building Vivarium Remediation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Industrial Construction Services |
$0.00 |
| HVAC Contract |
Progressive Plumbing |
$0.00 |
| PLUMBING Contract |
Progressive Plumbing |
$165,200.00 |
| OTHER Contract |
Industrial Construction Services |
$2,037,321.00 |
| ELECTRICAL Contract |
York Electric |
$42,127.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| MUM Lower Campus Drainage Correction |
| Contract Type |
Company Awarded |
Price |
| ALT. G-1 |
SK Construction |
$445,194.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Summer 2008 COM 135 Classroom Technology Upgrade |
| Contract Type |
Company Awarded |
Price |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| VOA Learning Center Audio Visual |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Sensory Technologies |
$193,285.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Miami Metro Bus Shelters |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Triad Construction |
$45,295.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Rentschler Hall Roof Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Neibert Enterprises |
$176,334.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Western Campus 12 KV Extension |
| Contract Type |
Company Awarded |
Price |
| ELECTRICAL Contract |
DeBra Kuempel Company |
$289,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| N Campus Parking Garage and Pearson Plaza Landscaping |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Natorp's |
$160,958.25 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Thesken Hall Elevator Upgrade |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Advanced Elevator Company |
$119,750.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| T And M Contract Telephone Installation and Repair Miami University |
| Contract Type |
Company Awarded |
Price |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Richard T Farmer School of Business Audio Visual Project |
| Contract Type |
Company Awarded |
Price |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| CAB Rm 125T Air Condition and Power Upgrade Project |
| Contract Type |
Company Awarded |
Price |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Hoyt Hall UPS Upgrade Phase II |
| Contract Type |
Company Awarded |
Price |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Johnston Hall Roof Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
C.A. Eckstein |
$521,904.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Pearson Hall Laboratory Renovations |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Triad Construction |
$750,100.00 |
| HVAC Contract |
GM Mechanical |
$279,800.00 |
| FIRE PROOFING Contract |
S.A. Comunale |
$22,575.00 |
| PLUMBING Contract |
Kenneth R Rogers Plumbing |
$175,649.00 |
| ALT. O-1 |
Data Cabling Solutions |
$25,431.00 |
| ALT. E-1 |
Butler County Electric |
$176,993.00 |
| Notice to Proceed: | | 02/29/2009 |
| Estimated Completion: | | 11/30/2009 |
|
|
| School of Engineering Lifeline Cable Project |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Triad Construction |
$26,500.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| RSC Lighting Retrofit |
| Contract Type |
Company Awarded |
Price |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| King Library Chilled Water Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Queen City Mechanicals |
$46,000.00 |
| ALT. M-2 |
Queen City Mechanicals |
$2,100.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| CPA Interior Renovations Area D |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Seyferth Building Company |
$65,764.00 |
| HVAC Contract |
Progressive Plumbing |
$19,400.00 |
| PLUMBING Contract |
Progressive Plumbing |
$0.00 |
| ELECTRICAL Contract |
Rapier Electric |
$16,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Miami University Airport Installation of AWOS III PT |
| Contract Type |
Company Awarded |
Price |
| ELECTRICAL Contract |
Ludwig Contracting |
$148,619.00 |
| ALT. E-2 |
Ludwig Contracting |
$3,600.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Residence Halls TV Upgrades |
| Contract Type |
Company Awarded |
Price |
| ALT. G-1 |
Frontier Media Solutions |
$34,204.00 |
| ALT. E-1 |
Daytep Construction |
$20,868.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| SWORD Book Depository |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
A.W. Farrell and Son, Inc. |
$98,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Flower Hall HVAC Improvements |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Blau Mechanical |
$510,000.00 |
| ALT. M-2 |
Blau Mechanical |
$20,700.00 |
| ALT. M-3 |
Blau Mechanical |
$8,900.00 |
| PLUMBING Contract |
Progressive Plumbing |
$57,100.00 |
| ALT. P-2 |
Progressive Plumbing |
$53,200.00 |
| ELECTRICAL Contract |
Butler County Electric |
$68,224.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Phillips Hall Elevator Upgrade |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Abell |
$57,907.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Walks and Drives 2009 |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
R.A. Miller |
$211,177.00 |
| ALT. O-1 |
J.K. Meurer Corp. |
$92,288.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| WC Duck Pond Bridge Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
CR&R, Inc. |
$401,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Thesken 2nd Floor Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Butler County Electric |
$114,270.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| HC 200 Mosler Hall Classroom Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Butler County Electric |
$81,090.00 |
| HVAC Contract |
Progressive Plumbing |
$16,200.00 |
| FIRE PROOFING Contract |
Dlamatian Fire Protection |
$7,100.00 |
| ELECTRICAL Contract |
Volk Electrical Contractors |
$27,622.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Johnston Hall 2nd Floor Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Butler County Electric |
$98,770.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Miami Inn Fire Alarm Replacement |
| Contract Type |
Company Awarded |
Price |
| ELECTRICAL Contract |
Rapier Electric |
$57,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Summer Painting 2009 |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
MXP General Contractor |
$122,850.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Yager Stadium West Stands Air Conditioning Unit Upgrades Phase II |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Butler County Electric |
$29,699.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Johnston Hall Carpet Teplacement |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
DeGeorge Ceiling and Flooring |
$45,900.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Marcum Steam Line Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Progressive Plumbing |
$219,400.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| East Quad Roads and Walk Upgrade |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Mainline Road and Bridge |
$1,428,000.00 |
| ELECTRICAL Contract |
Elex, Inc. |
$167,100.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Pearson Hall Roof and Exhaust Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
A.W. Farrell and Son, Inc. |
$729,800.00 |
| ELECTRICAL Contract |
Rapier |
$58,900.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Johnston Hall Fire Alarm Improvements |
| Contract Type |
Company Awarded |
Price |
| ELECTRICAL Contract |
Whalen Electric |
$57,737.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Hamilton Campus Classroom Technology Upgrade Summer 2009 |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Frontier Media Solutions |
$114,425.79 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Pearson Hall Closed Circuit Cooling Tower Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Progressive Plumbing |
$39,700.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| CPA Renovations AREA E |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Butler County Electric |
$53,382.00 |
| HVAC Contract |
Progressive Plumbing |
$42,800.00 |
| FIRE PROOFING Contract |
Quality Fire Protection |
$12,250.00 |
| PLUMBING Contract |
Progressive Plumbing |
$0.00 |
| ELECTRICAL Contract |
Whalen Electric |
$16,025.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Richard Hall Roof Repair Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Imbus Roofing Company |
$195,549.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| HC Mosler Hall Plaza Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Brookside Construction |
$555,856.00 |
| ELECTRICAL Contract |
Whalen Electric |
$59,508.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Farmer School of Business Landscaping Package |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Oberson's |
$145,941.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| HC Phelps Hall PArrish Auditorium Roof Replacement |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Neibert Enterprises |
$265,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Oxford Campus Audio Visual Upgrades Summer 2009 |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
AVI SPL |
$151,163.44 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Shriver 1809 Room Renovation |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
J B Schmitt Company |
$113,000.00 |
| PLUMBING Contract |
Progressive Plumbing Company |
$11,750.00 |
| ELECTRICAL Contract |
ESI , Inc. |
$24,648.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Phelps Hall Boiler Replacement |
| Contract Type |
Company Awarded |
Price |
| HVAC Contract |
Blau Mechanical |
$72,800.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Steam Plant Coal Bunker Number 3 Upgrade |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Orbit Sheet Metal |
$58,900.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Heritage Commons Interior Painting Fisher and Logan Halls |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Art Evans & Sons, Inc. |
$55,500.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|
|
| Cole Service Building Emergency Generator |
| Contract Type |
Company Awarded |
Price |
| ELECTRICAL Contract |
Rapier Electric |
$74,800.00 |
| Notice to Proceed: | | 08/21/2009 |
| Estimated Completion: | | 11/30/2009 |
|
|
| Laws Hall Rehabilititation Asbestos Abatement |
| Contract Type |
Company Awarded |
Price |
| OTHER Contract |
Cleveland Environmental Services, LTD |
$33,740.00 |
| Notice to Proceed: | | September 08, 2008 |
| Estimated Completion: | | October 08, 2009 |
|
|
| Steam Plant Partial Reroof |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Kerkan Roofing, Inc. |
$146,750.00 |
| Notice to Proceed: | | 09/21/2009 |
| Estimated Completion: | | 11/10/2009 |
|
|
| University Hall Parking Lot Expansion |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Barry L Brown Paving |
$46,770.00 |
| Notice to Proceed: | | July 30 , 2009 |
| Estimated Completion: | | August 15, 2009 |
|
|
| Alumni Hall Partial Roof Replacement |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Wm Kramer And Sons |
$229,270.00 |
| PLUMBING Contract |
Progressive Plumbing |
$15,800.00 |
| Notice to Proceed: | | 09/23/2009 |
| Estimated Completion: | | 90 days |
|
|
| Cradle of Coaches Plaza Statue Base Addition |
| Contract Type |
Company Awarded |
Price |
| GENERAL Contract |
Triad Construction |
$25,910.00 |
| ELECTRICAL Contract |
Daytep Construction |
$21,705.00 |
| Notice to Proceed: | | 08/24/2009 |
| Estimated Completion: | | 09/23/2009 |
|
|
| Upham Hall North Wing Rehabilitation |
| Contract Type |
Company Awarded |
Price |
| ALT. G-1 |
Oberle & Associates |
$1,215,000.00 |
| HVAC Contract |
Triton Services |
$453,624.00 |
| FIRE PROOFING Contract |
Quality Fire Protection |
$45,500.00 |
| PLUMBING Contract |
Driekast Piping Corp |
$129,000.00 |
| ELECTRICAL Contract |
Rapier Electric |
$245,000.00 |
| Notice to Proceed: | | |
| Estimated Completion: | | |
|